Built to Meet Emergency Demands
-
client
San Francisco Public Works -
location
San Francisco, CA -
size
17,500 SF
San Francisco’s Department of Emergency Management 911 Dispatch and Training Center is one of the nation’s busiest, handling more than 3,200 calls each day. TEF transformed the facility into a state-of-the-art emergency response hub, preserving critical operations while aligning with national standards and best practices.
Balancing Flexibility with Mission-Critical Standards
The 17,500-square-foot renovation accommodates 55 dispatcher workstations, with an elevated supervisor bridge offering clear sightlines across the dispatch floor. A technology-integrated training room, watch coordinator room, offices, locker facilities, and a break room round out the program; folding glass doors let the training room double as a classroom or expand dispatch capacity during surges. Upgraded power, data, and communications infrastructure support future technology and operational growth. The design team led extensive stakeholder engagement with dispatch staff, Public Works, Emergency Management, Fire, and Police to coordinate the project’s technical, security, operational, and performance requirements.
Prioritizing User Comfort and Well-Being
Ergonomic adjustable workstations and seating, acoustically controlled dispatch zones, and dedicated spaces for decompression, peer support, and wellness were essential to creating a supportive work environment for dispatchers who operate under pressure. Amenities such as generous locker facilities for storing personal desktop tools, a double-height break room, and a private quiet room reduce stress, reinforce resilience, and help dispatchers stay focused and effective during emergencies.
Phased Delivery in an Active Facility
TEF delivered the renovation in carefully planned and coordinated phases to sustain continuous operations throughout the building, working closely with the client and builders from pre-construction through construction completion to manage the technical and logistical complexities of an essential services facility. The team relocated dispatch staff to another floor in phases, rerouted power and data systems while sustaining required redundancies, and addressed construction noise, security, and logistics throughout.
Team
Collaborators
-
ArchitectTEF / Min Design JV
-
Structural EngineerStructus
-
Mechanical and Plumbing EngineerMHC
-
Electrical EngineerACG Engineers
-
Cost EstimatingM Lee Corporation
-
SpecificationsTopflight Specs
-
ContractorCM West
-
PhotographerMikiko Kikuyama